Sub Page Header
Home
Organising Committee
Important Deadlines
Call for Abstracts
Keynote Highlights
Exhibition and Sponsorships
Programme
Registration
Hotel & Accomodation
About Singapore
Contact Us
 
 
HomeAbstract SubmissionNotification of AcceptanceFull Manuscript SubmissionRegistrationSpacer

Notification of Acceptance

S/no Title Author Organisation Country
  KEYNOTE PRESENTATION      
1 Contemporary Issues that Affect Tunnelling Martin Knights International Tunnelling Association
 
UK
2 Design of Deep Excavations to Control Ground Displacement
 
Malcolm Bolton Cambridge University UK
3 Importance of 3D Finite Element Analyses for Some Excavations
 
Lee Fook Hou National University Singapore Singapore
4 Best Practices in the Design and Construction of Deep Excavations
 
Wong Kai Sin Nanyang Technological University  Singapore
  SPECIAL PRESENTATION
 
     
5 Safety as a Driver for Innovation in the Design and Construction of Underground Structures
 
Alan Powderham Mott MacDonald UK
 

ACCEPTED ABSTRACTS
 

     
6 The design and construction of the Rosebank Station Cut and Cover for the 2010 Soccer World Cup, South Africa
 
Alan Berry WorleyParsons Australia
7 3D Bearing Capacity of Shallow Foundations Located Near Deep Excavation
 
Jim Shiau University of Southern Queensland Australia
8 An Example of SFRC Tunnel Segmental Lining Design  Richard Gong Maunsell Australia Pty Lt Australia
9 Estimating the Magnitude and Risks of Ground Displacements for Bored Tunnelling in Soft Ground - A Probabilistic Approach S.J. Boone Golder Associates Ltd Canada
10 Challenges and Measures in the Construction of Jinping Auxiliary Tunnel
 
Chen Shougen Southwest Jiaotong University China
11 Rock Support Optimization for Pianqiao Diversion Tunnel
 
Deng Xifei Southwest Jiaotong University China
12 A Study on Rockburst Prevention Using Stress Release Methods
 
Gu Hongyuan Southwest Jiaotong University China
13 Probability statistic analysis of ground settlement curve due to deep excavation
 
Gu Lei-yu Tongji University China
14 A New Support Method for Strong Rockburst Prevention
 
Hu Weidong Southwest Jiaotong University China
15 A Study on Goaf Stability under Desert Expressways
 
Xiang Long Southwest Jiaotong University China
16 A Study on Nano-shotcrete Support for Ground Water Flow Zones
 
Yan Chaoping Southwest Jiaotong University China
17 Mechanical analysis of segment joint of shield tunnel Z.Y. Fan Tongji University, China
18 A Study on Large Power Jet Ventilation Technology in Long Tunnel Construction  Zhang Heng Southwest Jiaotong University China
19 Kowloon Southern Link - Managing Risks for Constructing Twin TBM Urban Railway Tunnels in Hong Kong
 
Neil Ng Mass Transit Railway Corporation, Hong Kong Hong Kong
20 Stability analysis of inclined shaft at Siah-Bishe pumped storage project; Iran 
 
Ali Karimi University of Tehran  Iran
21 Study on the Simultaneous Effects of Joint Spacing and Orientation on the Penetration Rate of TMN using Numerical Modeling
 
Hadi Bejari Shahrood University  Iran
22

Investigation of Squeezing Phenomenon in Dez - Qomrud Water Transfer Tunnel, Phase 1 & 2, Mrkazi, Iran
 

Mohammad Ataei Shahrood University of Technology Iran
23 Influence of the Bounding Surface Model Parameters on the Behavior of Excavation in Cohesive Soils File
 
Mohammed Shafiqu Qassun University Kebangsaan Malaysia Malaysia
24 Deep Excavation Risk Assessment in Early Design Stages - Example of the Warsaw 2nd Metro Line
 
Anna Sieminska-Lewandowska Warsaw University of Technology Poland
25 Analysis of the Heave of the Bottom of Deep Shaft Excavation
 
Grzegorz Bartnik Warsaw University of Technology Poland
26 Numerical Experiment On Short Term And Long Term Behaviour Of Two Bangkok Underpass On Soft Clay
 
Alea C. Roque Jr Arup Singapore Pte Ltd  Singapore
27 Excavation Management System for Bored Tunnels in Jurong Formation Soils
 
Aw Eng Ming Land Transport Authority Singapore
28 Evolution and Advances in the Instrumentation and Monitoring Works for Underground Construction - A Review
 
B. Suresh Kumar Soil Investigation Pte Ltd Singapore
29 The Response of Piles due to Tunnelling Adjacent to Pile Foundation for Circle Line Stage 3 (CCL3)
 
Cham Wee Meng Land Transport Authority Singapore
30 MacPherson Interchange Station - Providing for a Future Line
 
Chiang Chee Cheong Land Transport Authority Singapore
31 Design and Performance of a Temporary Cofferdam using Double Sheetpile Wall System in Soft Clay
 
Chow W.L. Amberg & TTI Engineering Pte Ltd Singapore
32 Seismic Analysis and Design if Segmental Tunnel Lining for Delhi Metro Project Contract BC-24
 
Chow W.L. Amberg & TTI Engineering Pte Ltd Singapore
33 Risk Management for Bored Tunnel Sump Pit Construction in Challenging Ground Condition
 
David Ng Chew Chiat Land Transport Authority Singapore
34 Omission of an Intermediate Layer of Strut by Observational Method in a Deep Excavation Project Using Hybrid Ground Treatment
 
David Ng Chew Chiat Land Transport Authority Singapore
35 Deep Tunnel Sewerage System - Challenges in Constructing the Link Sewers in Built-Up Areas of Singapore
 
Deveraj Sanmuganathan Public Utilities Board Singapore
36 Improving Data Quality and Reliability of Vibrating Wire Strain Gages by using Digital Signal Processing Technique
 
G H Tan SysEng (S) Pte Ltd Singapore
37 EPB Tunnelling under 2-storey Shophouses in Mixed Face Conditions
 
Han Chong Lim WorleyParsons Singapore Singapore
38 Ground Movement Predictions for Deep Excavations in Singapore 
 
Jonathan McCallum Mott MacDonald Singapore
39 Design and Performance of a Temporary Cofferdam for the Marina Barrage
 
K K Soh AGS Consultants Pte Ltd Singapore
40 Excavations in Jurong Formation Rocks and Soils - Potential Risks and Possible Mitigation Measures
 
Leslie Pakianathan Mott MacDonald Singapore Pte Ltd Singapore
41 Behaviour of Strut Load Distribution due to the Removal of Sacrificial Jet Group Layer in the Deep Excavation Work
 
Lewis Loo GeoEng Consultants Singapore
42 Response of Piled Foundation Due To Deep Excavation
 
Li Guojun Mott MacDonald Singapore
43 Risk Assessment of Bored Tunnelling Under 2-Story Shophouse A29 and A32 Along Pasir Panjang Road
 
Liew Yoon Ken CPG Consultants Pte Ltd Singapore
44 Monitoring and Back-Analysis of re-entrant Corner Behaviour in Deep Excavations for Stage 4 of the Circle Line.
 
Lim Chi-Sharn Land Transport Authority Singapore
45 Behavior of Stiff Earth Retaining Wall System in Soft Singapore Marine Clay
 
Lim Heng Thong CPG Consultants Pte Ltd Singapore
46 Bishan MRT Depot: Pile Removal and Underpinning of an Operational Depot's Deck
 
Lim Tuck Fang Land Transport Authority Singapore
47 Singapore Circle Line Stage 3 - The Challenges of Tunnelling in Close Proximity
 
Lim Tuck Fang Land Transport Authority Singapore
48 Design and Construction of Twin Mined Tunnels in Residual Soil 
 
Marcus Tong Amberg & TTI Engineering Pte Ltd Singapore
49 Tunnelling on the Circle Line - A Review of the Problems the Performance and the Progress
 
Nick Osborne Land Transport Authority Singapore
50 Removal of Underground Obstructions at Marina South 
 
Olof Thoren Gammon Construction Singapore
51 TBM Operation at the New MetroRail Project in Perth
 
Oskar Sigl Geoconsult Asia Singapore Singapore
52 Temporary Strutted & Anchored Sheet Piling at the New MetroRail Project in Perth
 
Oskar Sigl Geoconsult Asia Singapore Singapore
53 Controlling Ground Movement using Rigid Earth Retaining Wall System to Minimize Impact Adjacent Sensitive Structures Phua Hooi Leng Land Transport Authority Singapore
54 The use of Tube-A-Manchete Grouting as a Risk Mitigation Measure for the Protection if Structures against Ground Movement Phua Hooi Leng Land Transport Authority Singapore
55 Dry Soil Volumn for Excavation Management of Slurry TMBs Tunnelling at C853, Singapore
 
Sahabdeen Mohamed Mohideen WorleyParsons Singapore Singapore
56 Slurry TBM Tunnelling Risk Control & Lessons Learnt on CCL Stage 4 - Contracts 854
 
Samuel A McChesney Land Transport Authority Singapore
57 Grouting for Deep Excavations and Tunnelling
 
V. Ganeshan Maunsell Consultants (S) Pte Ltd Singapore
58 Observations on Inclinometer Measurements and Error Corrections
 
V. Ganeshan Maunsell Consultants (S) Pte Ltd Singapore
59 Instrumentation Results and their Interpretations
 
V. Ganeshan Maunsell Consultants (S) Pte Ltd Singapore
60 Effects of TBM Tunnelling on Pore Water Pressure Changes
 
Wen Dazhi Land Transport Authority Singapore
61 Ground Improvement by SMJC Method for the new Nicoll Highway Station
 
Yukio Ueda Nishimatsu Construction Co. Ltd, Singapore Office Singapore
62 A Case Study of a Deep Excavation in the Close Vicinity of Existing Buildings and Underground Structures
 
Zhang Dehui MWH Consultants Singapore
63 The Importance of the Maintenance in the TBMs 
 
Benigo Antuna Alvarez North of Spain Water Agency Spain
64 Tunneling Contingency Assessment : A case of EPB Shield Tunneling Project in Bangkok 
 
Pacharaporn Pokakon Chulalongkorn University Thailand
65 Tunneling Under Historical City, Istanbul
 
Kursad Elmali Yuksel Project International Turkey
66 Short-term Stability of an Excavation in Marine Clay
 
Alex Nikolic Buro Happold Ltd UK UK
67 Response of a Building under Excavation-induced Ground Movements 
 
Goh Kok Hun Land Transport Authority UK
68 Managing Geotechnical Risks for Design of Deep Excavations in San Jose, California
 
Andrew Liu Hatch Mott MacDonald USA
69 Large-Diameter Tunnelling Collapses: Recovery Design and Execution
 
Bradford F. Townsend Hatch Mott MacDonald USA
70 Transbay Transit Center – Development of the Downtown Rail Extension 
 
Bradford F. Townsend Hatch Mott MacDonald USA